A navy sedan inside the Denny's tunnel covered in foam.
Two Locations · Open 7 Days

Touchless wash.
90 seconds.
Drive out clean.

A PLC-controlled tunnel wash in Mississauga and Oakville. No appointments, no detail-shop wait. Pick the closer location below.

Exit · Mississauga
3436
MAVIS RD
(905) 272-0611
Exit · Oakville
1303
CORNWALL RD
(905) 338-1115
The Wash Sequence
Pre-soak, foam, soft-cloth brushes, rinse — the four stages of the Denny's tunnel wash.

90 seconds
in the tunnel.

A PLC-controlled, touchless tunnel wash. Drive in, hands off the wheel, foam on, soft cloth down, rinse, dry — drive out clean.

  1. Pre-soakLoosens road salt and brake dust before brushes touch the paint.
  2. Foam-cannon archTriple-foam coverage from nose to tailgate, even on side mirrors.
  3. Soft-cloth brushesGentle on clearcoat, tough on grime — no spinning bristles.
  4. High-pressure rinse + blow-drySpot-free finish; hand-dry attendants stage at the exit.

Pick your wash at the kiosk.

Same pricing at both locations. Pay at the entry, drive in, done.

3 Star Service
$23.99
Includes
  • Touchless car wash
  • Hand dry
Choose Location
4 Star Service
$49.99
Includes
  • Touchless car wash
  • Hand dry
  • Wheel brightener
  • Vacuum interior
  • Clean interior windows
+ $4 trucks, hatchbacks & small SUVs
+ $8 vans & large SUVs
Choose Location

See the in-bay menu at either location for current pricing.

All Cars Welcome

Your car
will smile.

A touchless tunnel means no spinning bristles touch your paint — so it doesn't matter what you drive. Daily driver, weekend toy, work truck. Roll in, roll out clean.

100%
Touchless
tunnel
~90s
From entry
to exit
7
Days a week
at both sites
2
Locations
Mavis & Cornwall
Open Now
Open Today
Both locations are washing cars right now.
9:00 AM 6:00 PM

Same hours, both locations.

Mon–Sat 9am to 6pm. Sun 9am to 5pm. The "open now" pip below pulses on today.

Sun
9–5
Mon
9–6
Tue
9–6
Wed
9–6
Thu
9–6
Fri
9–6
Sat
9–6

Two car washes. One drive away.

Pick whichever's closer — both keep the same hours and run the same PLC tunnel.